Florida High School Renovates Performing Arts Center

Construction recently began on a series of renovations and expansions to the Visual Performing Arts (VPA) Center at Booker High School in Sarasota, Fla. The school partnered with SchenkelShultz Architecture to enhance both the aesthetic and technical qualities of the space. The project is scheduled for completion by the end of 2022, according to a news release.

Booker High School Visual Performing Arts Center rendering

“The theater at Booker High School is rich in history and is one of the premier art and cultural ‘gems’ of the Sarasota community,” said SchenkelShultz partner Ken Dean. Renovations include expanding the public lobby for use as a pre-show gathering area and student art gallery; a new balcony and tiered orchestra level for the theater; enhancements to comfort, sightline, and acoustics from the audience; and an expansion that makes room for a black box theater, costume shop, green room and academic space.

“The design preserves the existing theater as a historically significant place to educate students and provides an artistic destination for performers, students, and the community,” said Ekta Desai, AIA, Partner and Design Lead at SchenkelShultz. “Simultaneously, we have elevated the space's production, technology, acoustics, and function, creating an environment that reflects the school's longstanding reputation for excellence.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition