Florida High School Renovates Performing Arts Center

Construction recently began on a series of renovations and expansions to the Visual Performing Arts (VPA) Center at Booker High School in Sarasota, Fla. The school partnered with SchenkelShultz Architecture to enhance both the aesthetic and technical qualities of the space. The project is scheduled for completion by the end of 2022, according to a news release.

Booker High School Visual Performing Arts Center rendering

“The theater at Booker High School is rich in history and is one of the premier art and cultural ‘gems’ of the Sarasota community,” said SchenkelShultz partner Ken Dean. Renovations include expanding the public lobby for use as a pre-show gathering area and student art gallery; a new balcony and tiered orchestra level for the theater; enhancements to comfort, sightline, and acoustics from the audience; and an expansion that makes room for a black box theater, costume shop, green room and academic space.

“The design preserves the existing theater as a historically significant place to educate students and provides an artistic destination for performers, students, and the community,” said Ekta Desai, AIA, Partner and Design Lead at SchenkelShultz. “Simultaneously, we have elevated the space's production, technology, acoustics, and function, creating an environment that reflects the school's longstanding reputation for excellence.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.

  • DLR Group Hires Three for Higher Education Practice

    Integrated design firm DLR Group recently announced that it has brought three new hires on board to help shape its higher education practice in California and the northeast, according to a press release.