Luxxbox Upgrades Linea Slimline Acoustic LED System

Luxxbox, which provides acoustic and flexible workspace solutions, recently announced significant upgrades to its slimline acoustic LED system. The Linea lighting fixture features noise absorption capabilities and acoustic performance. The new model features a plug-and-play power connector that allows canopies and power to be installed before the fixture, requiring only one power feed per run of lights, according to a news release. It also features a cassette-style drive to accommodate factory-programmable drivers after installation.

“The improvements made to the Linea installation process is an industry gamechanger,” said Jason Bird, Founder and Creative Director of Luxxbox. “Unique from other acoustic lighting fixtures on the market, the process is completely simplified with only one power feed needed per run.”

Linea Slimline Acoustic LED System
Photo courtesy of Luxxbox

The Linea fixture debuted in April 2019 and is intended to maximize noise cancellation and acoustic surface areas. The dimmable LED fixtures come as a direct or indirect wash and features shielding options like direct louvered, direct diffused, indirect lensed and unlit. It also comes in four height options, multiple lengths and more than 70 colors, according to a news release. Each fixture can be used independently or paired together to form a continuous run of acoustic illumination.

More information is available on the Luxxbox website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Spaces4Learning Announces 2026 Product Award Winners

    Spaces4Learning has just announced the winners of the 2026 Product Awards! The award program spotlights outstanding product development achievements of manufacturers and suppliers whose products or services are considered to be particularly noteworthy in their ability to enhance K–12 and higher-education learning environments.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Dallas-Area District Debuts Three New Facilities

    The Duncanville Independent School District in southwest Dallas, Texas, recently held ribbon-cutting ceremonies for three new facilities that resulted from a $170-million bond program passed in 2023, according to a news release.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.