Luxxbox Upgrades Linea Slimline Acoustic LED System

Luxxbox, which provides acoustic and flexible workspace solutions, recently announced significant upgrades to its slimline acoustic LED system. The Linea lighting fixture features noise absorption capabilities and acoustic performance. The new model features a plug-and-play power connector that allows canopies and power to be installed before the fixture, requiring only one power feed per run of lights, according to a news release. It also features a cassette-style drive to accommodate factory-programmable drivers after installation.

“The improvements made to the Linea installation process is an industry gamechanger,” said Jason Bird, Founder and Creative Director of Luxxbox. “Unique from other acoustic lighting fixtures on the market, the process is completely simplified with only one power feed needed per run.”

Linea Slimline Acoustic LED System
Photo courtesy of Luxxbox

The Linea fixture debuted in April 2019 and is intended to maximize noise cancellation and acoustic surface areas. The dimmable LED fixtures come as a direct or indirect wash and features shielding options like direct louvered, direct diffused, indirect lensed and unlit. It also comes in four height options, multiple lengths and more than 70 colors, according to a news release. Each fixture can be used independently or paired together to form a continuous run of acoustic illumination.

More information is available on the Luxxbox website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Oklahoma Announces New Campus Master Plan

    The University of Oklahoma in Norman, Okla., recently announced that it will soon launch a new, comprehensive Campus Master Plan to guide the campus’ physical development during the next decade, according to a news release.

  • University of Pittsburgh to Build New Residence Hall

    The Board of Trustees from the University of Pittsburgh in Pittsburgh, Penn., recently approved the construction of a new residence hall for first-year students, according to university news.

  • Northeastern University Breaks Ground on New Housing Community

    Northeastern University recently announced the groundbreaking of a new student housing community on its campus in Boston, Mass., according to a news release. The university is partnering with American Campus Communities (ACC) for development of the project, which will have the capacity for 1,200 students and has a scheduled completion date of fall 2028.

  • Cal Poly Humboldt Starts Construction on Healthcare Education Hub

    California State Polytechnic University, Humboldt in Arcata, Calif., recently announced that work has begun on a renovation project that will turn the Stewart Building into a new Healthcare Education Hub, according to a news release. The university is partnering with Sundt Construction Inc. for construction services.