Luxxbox Upgrades Linea Slimline Acoustic LED System

Luxxbox, which provides acoustic and flexible workspace solutions, recently announced significant upgrades to its slimline acoustic LED system. The Linea lighting fixture features noise absorption capabilities and acoustic performance. The new model features a plug-and-play power connector that allows canopies and power to be installed before the fixture, requiring only one power feed per run of lights, according to a news release. It also features a cassette-style drive to accommodate factory-programmable drivers after installation.

“The improvements made to the Linea installation process is an industry gamechanger,” said Jason Bird, Founder and Creative Director of Luxxbox. “Unique from other acoustic lighting fixtures on the market, the process is completely simplified with only one power feed needed per run.”

Linea Slimline Acoustic LED System
Photo courtesy of Luxxbox

The Linea fixture debuted in April 2019 and is intended to maximize noise cancellation and acoustic surface areas. The dimmable LED fixtures come as a direct or indirect wash and features shielding options like direct louvered, direct diffused, indirect lensed and unlit. It also comes in four height options, multiple lengths and more than 70 colors, according to a news release. Each fixture can be used independently or paired together to form a continuous run of acoustic illumination.

More information is available on the Luxxbox website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Baton Rouge Center for Visual and Performing Arts

    Baton Rouge Center for Visual and Performing Arts

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Baton Rouge Center for Visual and Performing Arts has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Photo courtesy of Kraus-Anderson

    Minnesota District Completes $49.7M Addition, Renovation Project

    St. Paul Public Schools in St. Paul, Minn., recently announced the completion of a $49.7-million addition and remodeling project at two district schools, according to a news release.

  • Florida District Completes Construction on New Leadership Institute

    Pinellas County Schools near Tampa, Fla., recently announced that construction is complete on the new Dr. Michael A. Grego Leadership Institute, according to a news release. The district partnered with Rowe Architects for the project’s design and with Skanska for construction services.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.