ASU Thunderbird School of Global Management Selects Display Technology Partner

The Arizona State University Thunderbird School of Global Management recently announced that it has selected products from visualization technology provider Planar to install in its new global headquarters in Phoenix, Ariz. The 110,000-square-foot, five-story space was constructed in time for Thunderbird’s 75th anniversary and features spaces like a Digital Global Forum, Global Decision Theater, Founders Ring, classrooms, meeting rooms, administrative spaces and more, according to a news release.

“Our vision is to not only reclaim our position as the most global leadership and management school in the world, but to also be the most digital and technological,” said Sanjeev Khagram, director general and dean of the Thunderbird School. “That was our mantra for designing and building this fantastic new global headquarters, and it’s the long-term partnerships with collaborators like Planar that has brought it to life.”

Planar technology in the facility entrance, Digital Global Forum and Visualization Room includes the Planar CarbonLight CLI Series LED video display with a nearly 9-foot diameter; an LED video wall measuring 18 feet wide and 5 feet high; a 360-degree LED video ribbon of the Planar CarbonLight CLI VX Series measuring 146 feet long and 6.5 feet high; and a 55-inch Planar LookThru Transparent OLED Display at the front entrance.

Classrooms and meeting spaces will contain multi-touch tables with 55-inch ultra-narrow bezel optical touch LCD displays; Planar HB Series Huddle Board touch screen displays measuring 75 inches in the Dean’s suite; and hundreds of 4K LCD displays measuring between 55 and 98 inches in various classrooms and learning spaces.

“It’s an incredible privilege to power Thunderbird’s new global headquarters with Planar’s industry-leading display solutions,” said Planar Executive Vice President Adam Schmidt. “Thunderbird is a world-renowned institution with a reputation of being at the forefront of innovation. In addition to elevating viewing and learning experiences, our extensive portfolio of groundbreaking visualization technologies is a perfect match for Thunderbird’s vanguard capabilities for global connectivity in its new high-tech facility. We’re thrilled to be making history with one of the most technologically sophisticated global management schools in the world.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.