Missouri University Selects Builder for Protoplex Building

Missouri University of Science and Technology in Rolla, Mo., recently announced that it has selected the construction manager at risk for its upcoming Protoplex building. PARIC Corp. will spearhead the new facility that will become the anchor of the university’s Manufacturing Technology and Innovation Campus. The Protoplex building comes with an estimated price tag of $53.4 million and will cover 116,000 square feet, according to local news.

A news release reports that the facility will connect federal, state, and industry agencies alongside colleges and universities throughout the state. “The Missouri Protoplex will be the headquarters for a state-wide ecosystem where experts, innovators, small and large businesses, entrepreneurs, educators, and policy-makers develop and adopt the technologies needed to create and sustain manufacturing jobs throughout the state,” according to the press release.

The space is set to include labs and shop spaces, high-bay and double-height labs, meeting and collaboration spaces, storage, administrative space, display spaces, and a lobby area. The university is also partnering with Mackey Mitchell Architects, Perkins&Will Architects, and McClure Engineering. Construction is scheduled to start during summer 2023.

According to the university website, the facility is designed around the manufacturing industry’s four fundamental disciplines: materials, manufacturing & methods; pre-production testing & development; the forge-steel and advanced metallurgy; and cyber-physical systems security, testing & development. The Protoplex building will offer space and equipment across its offices, labs, and research and production facilities for each facet.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • KWK Architects Announces Full Transition to Lawrence Group Branding

    KWK Architects recently announced that it will complete its transition to the Lawrence Group brand effective July 1, according to a news release. The merger marks the end of a three-year strategic integration process that began in March 2023 to unite the firms.

  • Washington State District Breaks Ground on New Elementary School

    Cheney School District No. 360 in Spokane County, Wash., recently announced that construction has begun on a new elementary school, according to local news. The district held a groundbreaking ceremony on May 18 in Airway Heights for the yet-to-be-named school, which is scheduled to open in fall 2027.

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.