California District Breaks Ground on Total Campus Replacement

The West Contra Costa Unified School District (WCCUSD) recently reached the groundbreaking milestone for a total campus replacement project for an elementary school in San Pablo, Calif. The new Lake Elementary School will have the capacity for almost 500 students between transitional kindergarten (TK) and sixth grade, according to a news release. The district is partnering with Quattrocchi Kwok Architects for the building’s design and Alten Construction Inc. for construction.

“We are thrilled to see our community and faculty vision come to fruition, said WCCUSD Superintendent Dr. Chris Hurst. “We have long sought a campus that enhances Lake Elementary School’s educational programs, supports the needs of the community and will be a source of pride for students, parents, and staff. We are grateful to partner closely with our project team, whose guidance and expert knowledge has been instrumental in navigating complexities while remaining on budget.”

According to the news release, the new facility’s front entrance will contain administrative offices and the school library, which will play home to community events on nights and weekends. Students in first through sixth grade will be based out of learning suites that consist of individual classrooms that open into a larger, communal space. Kindergarten and TK classrooms will be separated from the older grades and share outdoor play areas. The new campus will also feature a multipurpose building with space for food service, indoor and outdoor eating spaces, and space for performances.

“We’ve collaborated closely with the district to cultivate an entirely reimagined Lake Elementary School campus—one that will support and advance the school’s needs beyond that of the old classroom walls,” said QKA Principal and CFO John Dybczak. “Our trusted design-build partnership with Alten Construction was invaluable as we navigated the serious challenges associated with demolishing and rebuilding a school campus while prioritizing safety and uninterrupted learning throughout the process.”

Sustainability features include a cool roof and architectural materials and finishes made up of recycled content. The building also features energy-efficient MEP equipment like LED lighting and low-flow plumbing. The outdoor spaces make use of drought-tolerant landscaping, synthetic turf, and shade coverings for outdoor dining and playgrounds to reduce water use.

Construction will take place in two phases and has an estimated completion date of summer 2025.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • Nonprofit Launches Center to Boost Data-Driven Student Success Strategies

    National nonprofit Complete College America (CCA) recently launched the Center for Leadership, Institutional Metrics, and Best Practices (CLIMB), according to a news release. CLIMB’s ultimate purpose is to help higher-education institutions use data-driven strategies to improve student outcomes by providing tools, frameworks, and support.

  • California High School Debuts $35M Performing Arts Center

    Irvine High School in Irvine, Calif., recently opened its new Performing Arts Center built in partnership with C.W. Driver Companies, according to a news release. The facility cost $35 million and covers about 25,000 square feet.

  • Addressing the Housing Affordability Crisis Through Creative Campus Development

    Many Southern California college and university campuses are living amidst surging housing costs, driving the need to house more of their populations on campus. Especially for community colleges, the need to support millions of unhoused and housing insecure students has become a prominent issue that lawmakers and institutions alike are trying to solve.

Digital Edition