Bechtel to Design, Build Electric School Bus Charging Stations

Engineering, construction, and project management company Bechtel recently announced that it will begin designing and building a series of electric school bus charging stations, according to a news release. The firm was chosen by First Student, North America’s largest provider of student transportation, to begin developing the project. The release also announced that the two organizations plan to partner on future electric vehicle deployments.

“Bechtel provides electric vehicle charging infrastructure to fleet customers so they can focus on their core business, whether it is safely moving students or delivering packages,” said Catherine Hunt Ryan, Manufacturing & Technology business president. “Vehicle fleet operators are instrumental in the electric vehicle transition. Bechtel will help First Student advance their electrification goals by being a one-stop partner through design and build.”

Electric school buses are more efficient, more sustainable, and need less maintenance than traditional school buses, according to First Student. Bechtel’s electrification-related services include feasibility studies, site selection, front-end engineering design, procurement, construction management, and project management, according to the news release.

“Bechtel offers predictable project outcomes across the electric vehicle value chain,” said Justin Britt, Bechtel’s general manager for Electric Vehicles. “Building a future of vehicle electrification means investing in infrastructure today in everything from raw material extraction, processing plants, battery component manufacturing, final assembly, charging stations, and recycling.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition