California Elementary School to Break Ground

The Folsom Cordova Unified School District in Folsom, Calif., is set to break ground on its newest elementary school, according to local news. The groundbreaking ceremony for Alder Creek Elementary School will take place at 5 p.m. local time on Tuesday, May 15, and the new facility is scheduled to open in time for the 2024–25 academic year.

The facility will stand two stories and cover 71,000 square feet, the Sacramento Bee reports. It will have the capacity for about 764 students in grades TK–5.

The district granted final approval for the project at a board meeting in late March, according to ABC10 News. The school’s construction is part of a wider master plan spanning 3,585 acres across the Folsom Ranch Development area. ABC10 News also reported separately that the community is planned to include three other elementary schools, one middle school, and a high school.

According to the Folsom Times, the district partnered with Rainforth Grau Architects for the project’s design. Plans for the site include a sports field, asphalt recreation and play areas, basketball courts, and room for later additions of portable buildings and a student care center. The contractors for the project have been named as Roebbelen Contracting and Lease Leaseback.

Funding for the project is coming from a combination of Measure M Bond state funds, general obligation bonds, and developer fees, the Folsom Times reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • Classical building columns display digital data streams

    The Campus Nervous System: Why Facilities Risk Is Now a Leadership Issue in Higher Education

    Facility performance now intersects with safety, compliance, on-campus experience, institutional reputation, and financial resilience. That places it firmly on the leadership agenda.