California District’s Solar Portfolio Wins Environment + Energy Leader Award

A 5.67 MW Solar Portfolio by DSD Renewables that is currently in use by the San Bernardino City Unified School District in California recently won the Top Project of the Year Award in the 2023 Environment + Energy Leader Awards program, according to a news release. The portfolio is the organization’s largest installation for a school district and is playing a crucial role in helping the district meet its goal of transitioning to 100% renewable energy across all of its facilities by 2024.

According to the news release, 14 of 16 planned sites are currently complete and operational. Once the project is finished, it will generate 9,456 MWh of clean energy per year across the district’s 16 schools. The sites already in use are providing enough solar energy to offset an average of 100 percent of those sites’ energy needs, the news release reports. The last two installations have an estimated completion date of the end of 2023.

“This portfolio brings tremendous benefit to the school district,” said SBCUSD’s Director of Facilities Planning & Development, Thomas Pace. “Thanks to the hard work from the team at DSD, this portfolio will contribute to the $60 million in savings we’ve estimated in electricity costs over the next 30 years—which we’ll be able to re-invest into upgrading classrooms and other campus facilities. It’s a really big win for the district that will provide residual benefits for all of our faculty, students, and staff.”

Site-specific challenges included designing for the region’s wind and seismic conditions; following California Division of the State Architect’s new regulations, and soil- and wind-loading characteristics’ violations of special hazard zones. Much of the work also took place during the pandemic, against the backdrop of both COVID and supply-chain issues, the news release reports.

“For our largest project for a school district, this portfolio certainly came with unique and unforeseen challenges,” said Ben Jones, DSD’s EVP of Canopy Design & Structural Engineering. “But ultimately, our dedication, flexibility, and experience allowed us to overcome those hurdles and deliver valuable, cost-effective projects to the school district that will help them reach their sustainability goals. It’s really a testament to the commitment of both our team and the district for making these projects come to life, and to be selected as an E+E Leader Top Project of the Year is truly an honor.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.

  • Northeastern University Breaks Ground on New Housing Community

    Northeastern University recently announced the groundbreaking of a new student housing community on its campus in Boston, Mass., according to a news release. The university is partnering with American Campus Communities (ACC) for development of the project, which will have the capacity for 1,200 students and has a scheduled completion date of fall 2028.

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.