Lehigh University Selects Construction Firm for $70M Building Renovation

Lehigh University in Bethlehem, Penn., recently announced that it has selected a construction and development firm for a $70-million renovation project on campus, according to local news. Skanska will spearhead the redevelopment of Clayton University Center, a two-year project that will involve revamping its facilities while also preserving historic elements and nuances of the building. Major updates are set to include upgrades to utilities and installing a fire-protection system, Lehigh Valley Business reports.

Project elements include new electrical and mechanical equipment; renovations to gathering spaces, meeting rooms, administrative space, and lounges; and replacement of doors, windows, and roofing. The work will preserve existing building features like historic millwork and wood paneling, stained-glass windows, and the stone exterior.

“Skanska is a valued partner as we undertake the renovation of this important building on Lehigh’s campus,” said Chris Cook, the university’s Vice President for Strategic Planning and Initiatives. “With thoughtful design, we are breathing new life into the Clayton University Center, creating a fully functional space that will serve as a physical center for meaningful connections, idea exchange, and the cultivation of a strong campus community. We eagerly anticipate the transformation of this building into a vibrant hub at the heart of our campus, fostering community engagement, collaboration, and growth.”

A Skanska press release details new technologies the firm will use to ensure the full preservation of the building’s character. Laser-scanning provides a non-contact surveying method of the 100-year-old building. The captured data will be rendered in 3D and will offer the full means to analyze and visualize the structure. Skanska will also use Building Information Modeling (BIM) to plan, coordinate, and visualize as-built conditions.

“We’re proud to partner with Lehigh University and to be playing an integral role within the renovation of the historic Clayton University Center, the first building built on the University’s campus,” said Todd Lofgren, Skanska’s executive vice present and general manager of Greater Philadelphia building operations. “With our skilled and diverse workforce, we’re able to preserve the integrity of the original building while ensuring its longevity for the generations to come.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Pfluger Architects Announces Promotions of Seven Staff Members

    Texas-based architecture firm Pfluger Architects recently announced that it has promoted seven staff members to senior-level positions. One of the promotions is that of Dallas-based Senior Project Architect Chad Martin to Principal, according to a news release.

  • The Role of Unified Communications in Hyflex Education

    Academic technology and pedagogy have evolved in ways few could have imagined a decade ago. Today, hybrid/flexible (or hyflex) learning environments — a mix of in-person and remote instruction — are the new normal. However, as promising as it sounds, making hyflex work smoothly is no small feat.

  • Boosting Student Wellness and Safety Through Indoor-Outdoor School Spaces

    Engaging students through facilities designed for indoor and outdoor learning and activities reflects a growing awareness of how children learn and thrive, with educators recognizing the importance of getting outside and disconnecting from technology. And, as today’s youth grapple with the urgent mental health crisis of increased anxiety and loneliness fueled by both the pandemic and technology, along with a related crisis in youth physical health, the wellness benefits of getting outside have never been so palpable.

  • Florida Elementary School to Undergo $47M Reconstruction

    The School District of Osceola County in Kissimmee, Fla., recently announced a partnership with construction firm Skanska to reconstruct Reedy Creek Elementary School, according to a news release. The $47-million project will involve the new construction of a 96,000-square-foot academic center, renovating the remaining facilities, a full-site redevelopment, and demolishing portions of the existing school.

Digital Edition