University of Cincinnati Plans Demolition, Replacement of Campus Landmark

The University of Cincinnati in Cincinnati, Ohio, recently announced plans to demolish and replace campus landmark Crosley Tower, according to local news. The 16-story concrete structure is set for to come down beginning in January 2026 to make room for a new academic and research facility.

The new facility is part of a $240-million project outlined in recently filed bidding documents that will rearrange and improve a variety of teaching and research spaces around campus. According to Local12 news, construction on the new building will begin in January 2027 and has an estimated completion date of June 2029.

The university’s Office of Planning+Design+Construction determined that repairs to Crosley Tower—which was built in 1969—would be too difficult, reports Cincinnati.com. The tower houses labs for chemistry and biology classes. Work will take place in three phases. The first is to abate the presence of asbestos, mercury, and lead; the second is demolition; and the third is new construction. Construction has an estimated budget of $215 million.

Local news reports that the university has been considering the decision to demolish the building for about five years. The building was at 50% capacity in 2018, when the university issued a timeframe of tearing it down within the next five to ten years. In 2020, the university reported that demolition could start as soon as 2025.

According to the bidding documents, the program’s objectives include the creation of new flexible, open-bay experimental research labs and supporting research facilities; new flexible teaching labs; new standardized researcher and faculty offices; new general-purpose, centrally scheduled classrooms; and student success and collaboration spaces.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.

  • Northeastern University Breaks Ground on New Housing Community

    Northeastern University recently announced the groundbreaking of a new student housing community on its campus in Boston, Mass., according to a news release. The university is partnering with American Campus Communities (ACC) for development of the project, which will have the capacity for 1,200 students and has a scheduled completion date of fall 2028.

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.