UAB Completes Phase I of STEM Complex Construction

The University of Alabama at Birmingham recently announced that the first phase of construction on a new Science and Engineering Complex is complete, according to a news release. The university is partnering with Hoar Construction on the three-phase project, which will unite all of the university’s basic science undergraduate and graduate programs underneath one roof. Phase I consists of a 138,842-square-foot, four-story facility featuring labs and classrooms for biology, chemistry, and physics, as well as administrative space.

“We are proud to deliver this project to the students, faculty, and staff at UAB, as the new Science and Engineering Complex represents a significant commitment to advancing the university’s prowess as a key research hub that enhances career opportunities and bolsters economic development across Alabama,” said Chad Holland, project executive at Hoar. “This project was completed at the highest quality for the next generation of students, leaders and innovators within science and engineering. Hoar remains steadfast in our commitment to build top-tier projects across all realms of higher education, and we are honored to contribute to the university’s growth in our hometown of Birmingham.”

The facility was designed as a team-learning environment that will promote student collaboration between both students and faculty in different scientific disciplines. Specialized workspaces include an optics lab, research labs for student shadowing, and cold-growth environment rooms.

The news release reports that Hoar used computerized, 3D models of the structure to address design concerns during the construction process. The models were used to assess material quantities, optimize item placement, and identify design conflicts. Additionally, Building Information Modeling (BIM) were used to streamline the installation of plumbing and electrical components to save both time and cost.

The university is also partnering with lead architect Goodwyn, Mills & Cawood for the building’s design, as well as Lord Aeck Sargent (LAS) for lab and research space consulting.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • S4L Launches 2025 Facilities and Construction Brief Survey

    Spaces4Learning recently launched its 2025 Facilities and Construction Brief Survey, which gathers information on K–12 and higher education construction projects nationwide from the previous year. The data we get from you, our readers, forms an industry report offering an overview of current trends in school facilities.

  • Rush-Henrietta Central School District’s Sperry High School

    A New Perspective: Using Adaptive Reuse Concepts in K-12 Planning

    In the face of increasing pressures on construction timelines, budgets, and material availability, the renovation and reuse of pre-existing structures for new purposes can help bridge the gap between modern school programming and outdated school infrastructure.

  • Schools In Focus: Talking Campus Security with Mitch McKinley

    Furnishing the Future: Adaptive Solutions for Modern Learning Spaces

    On this episode of Schools in Focus, we'll talk about the role that classroom furniture plays in creating adaptive, flexible learning spaces. Our guest is Wesley Edmonds, the Director of Workplace, Adaptive Solutions at OFS.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

Digital Edition