University of Tulsa Opens State’s Largest Starbucks

The University of Tulsa recently opened the largest Starbucks in the state of Oklahoma, according to a university news release. McFarlin Library debuted the 3,014-square-foot space on its main floor. The location’s decoration, including modern furniture and art, were specifically tailored to the library’s décor, and it accepts the university’s Hurricane Gold Dollars for food and drink purchases, the news release reports.

Construction took just four months, and the new Starbucks takes over a space formerly occupied by a campus computer lab. The lab relocated to a renovated space in the Student Union.

“We are excited to offer this new dining option and bright space to our students. Moreover, we are pleased that the project was completed in time to welcome the alumni and families who are joining us for the TU Homecoming activities this week,” said University President Brad R. Carson. “Much like the recent upgrade of the campus Chick-fil-A, Starbucks is extremely popular among students, and no university treats students better than The University of Tulsa.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.

  • Designing Third Spaces That Do What AI Can't

    In 2026, education is evolving faster than ever. With AI reshaping everything from lesson planning to personalized instruction, schools and universities are turning their attention to what AI can’t replicate: spaces that foster collaboration, community, and creativity.

  • Dallas ISD Voters Approve $6.2B Bond Package

    Dallas ISD voters have approved a record-setting $6.2-billion bond package that district leaders say will modernize aging campuses, eliminate portable classrooms and reshape learning environments across one of the nation’s largest school systems.