Massachusetts Charter School Breaks Ground on New Academic Building

The Advanced Math and Science Academy Charter School in Marlborough, Mass., recently broke ground on a new 17,000-square-foot academic building, according to a news release. The facility will offer additional classroom and science lab space for the campus, which serves students in grades 6–12. The school partnered with Finegold Alexander Architects for the building’s design.

The public charter school currently owns and occupies a three-building space formerly used as an office park. The new academic facility has been designed to more closely support the school’s accelerated academic program. Phase one of the project includes both the new facility and a redesign of parking and circulation areas to improve pick-ups and drop-offs.


Rendering courtesy of Finegold Alexander Architects

“We are excited to embark on this significant partnership with AMSA to creatively address the design challenges that the school is currently facing,” said Finegold Alexander Principal and K–12 studio leader Regan Shields Ives.

According to a school news release, the new building will alleviate classroom space restrictions and feature state-of-the-art classroom technology and lab equipment. The project will also include grading for a future multipurpose events facility and gymnasium that will stand next to the academic building.

Funding for the project comes from a combination of school equity ($4 million), a tax-exempt bond ($24 million), and philanthropy ($2 million).

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • Classical building columns display digital data streams

    The Campus Nervous System: Why Facilities Risk Is Now a Leadership Issue in Higher Education

    Facility performance now intersects with safety, compliance, on-campus experience, institutional reputation, and financial resilience. That places it firmly on the leadership agenda.