Workplace Solutions Company Receives Cooperative Purchasing Contract

Workplace solutions company Fellowes recently announced that it has been awarded a cooperative purchasing agreement with government organization Sourcewell. A news release reports that Fellowes was presented with the contract in the “Furniture Solutions with Related Accessories and Services” category after a rigorous submission process that resulted in contracts meeting or exceeding local procurement requirements.

The contract is effective as of Nov. 30, 2023, and expires on Dec. 4, 2027. According to the Fellowes’ landing page on the Sourcewell website, the contract provides Sourcewell with access to Fellowes’ modular walls, benching, systems furniture, storage solutions, training & conference tables, height-adjustable tables, cable management, monitor arms, power solutions, lighting, keyboard management, and ergonomic accessories.

Fellowes is a fourth-generation, family-owned company that offers a wide range of wall systems and workspace products. Its customer-focused approach allows it to provide “thoughtfully designed, innovative, and reliable workspace accessories” to increase both productivity and inspiration.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • St. John Fisher University

    Classroom Revitalization – Basil Hall Room 216

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. St. John Fisher University's Basil Hall Room 216 Classroom Revitalization has been recognized with an EDS 2026 Project of Distinction award in the category of Spaces.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • nursing students talk while studying in a hallway

    Elsevier Launches VR Simulation Solution for Nursing Students

    Elsevier has introduced Shadow Health Lab with Virtual Reality, a simulation platform that allows nursing students to interact with virtual patients and build clinical judgment skills in a safe, realistic environment.

  • California District Opens New Robotics Center

    The Fremont Union High School District (FUHSD) in Cupertino, Calif., recently held a Grand Opening ceremony for a new, district-wide Robotics Center, according to a news release. The 14,500-square-foot facility was designed by Quattrocchi Kwok Architects (QKA); Landmark Constructors served as the builder and Blach Construction as general construction manager.