DIGroup Architecture Completes First NYC-Area School

DIGroup Architecture recently announced the completion of its first education project in New York City, according to a news release. P.S. 748, The Albee Square Campus, will take up six floors of a new 34-story office tower in Brooklyn, N.Y., and is part of a larger city plan to add the capacity for 45,000 new students as part of the New York City School Construction Authority’s 2020–24 Capital Plan. The facility is set to open its doors to students in September.

The PreK–5 school covers about 80,000 square feet and includes 14 total classrooms, two special education classrooms, gym, cafeteria and kitchen, assembly space, and dedicated entryway on the office tower’s ground floor. During construction, the space served as the temporary home for Design Works High School during the 2023–24 academic year.

“This project is a true reflection of the work we are committed to at DIG, and we are privileged to be a part of SCA’s investment in New York City Schools,” said Jeff Venezia, DIG’s chief executive officer. “The temporary use of the Albee Square Campus by Design Works High School also demonstrated the flexibility of the space, as well as the adaptability and commitment of NYC SCA to remain nimble in accommodating student needs.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Construction Begins on New University Research Vessel

    Boat-building company All American Marine recently announced that it has begun construction on a new catamaran research vessel for the University of Texas Marine Science Institute (UTMSI) in Port Aransas, Texas, according to a news release.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Children walking along bright school corridor with motion blur

    How Next-Gen Design Is Reshaping the Student Experience

    The environments where students learn play a crucial role in shaping their growth in and out of the classroom. By centering design on well-being, flexibility, and purpose, districts can ensure their facilities remain vibrant community assets for many years to come.