New Jersey K–12 District, PureTek Partner to Create Three New Education Spaces

Audiovisual solutions company PureTek Group recently partnered with Plainfield Public Schools in Plainfield, N.J., to create three new educational spaces for the district, according to a news release. The project involves upgrading the existing Plainfield High School auditorium into a performing arts center, a mini-theater into a blackbox theater, and two adjacent unused classrooms into an Esports Arena. The renovations will create new STEAM and CTE learning opportunities across the district.

The Esports Arena contains 20 gaming stations for players, as well as additional stations for broadcast operators, shoutcasters, and a replay operator. Spectators can watch from the school’s auditorium, and the blackbox theater also serves as a greenroom for teams not currently playing. Technology highlights include immersive lighting via criss-crossing, ceiling-mounted strips; integration with the performing arts center and blackbox theater; and broadcasting capabilities.

The Performing Arts Center (PAC) has a capacity for 1,600 and will play home to student performances. In addition to Esports Tournaments, it will also be used for rentals and community support programs. Technology highlights include the unRAVL Controls, which offer streamlined and intuitive control for rigging, AV, and lighting systems from a single touch panel. The PAC also has a large projection screen with a 30,000-lumen 4K laser projector, according to a project fact sheet.

The Blackbox Theater has a 120-seat capacity and will be used for arts education and performance spaces. It can also serve as the esports green room, as a professional education space, and a college-style lecture hall to prepare older students for university settings. The Blackbox Theater also uses the unRAVL System for rigging, audio, visual, and lighting solutions, the fact sheet reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Photo credit - Chuck Coates

    Florida District Modernizes Central Energy Plants at Two High Schools

    Flagler Schools, a public school district in Flagler County, Fla., recently partnered with Matern Professional Engineering to modernize the central energy plants at two of its high schools, according to a news release. The project is part of a larger, district-wide effort to reduce energy costs and operational expenses.

  • Benson Polytechnic High School in Portland, OR

    Preserving Legacy, Designing for the Future

    As historic academic buildings age, institutions face a difficult decision: preserve and adapt or demolish and rebuild. How do we honor the legacy of these spaces while adapting them to meet the needs of modern learners?

  • California K–12 District Completes Elementary School Campus Replacement

    The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade.