New Jersey K–12 District, PureTek Partner to Create Three New Education Spaces

Audiovisual solutions company PureTek Group recently partnered with Plainfield Public Schools in Plainfield, N.J., to create three new educational spaces for the district, according to a news release. The project involves upgrading the existing Plainfield High School auditorium into a performing arts center, a mini-theater into a blackbox theater, and two adjacent unused classrooms into an Esports Arena. The renovations will create new STEAM and CTE learning opportunities across the district.

The Esports Arena contains 20 gaming stations for players, as well as additional stations for broadcast operators, shoutcasters, and a replay operator. Spectators can watch from the school’s auditorium, and the blackbox theater also serves as a greenroom for teams not currently playing. Technology highlights include immersive lighting via criss-crossing, ceiling-mounted strips; integration with the performing arts center and blackbox theater; and broadcasting capabilities.

The Performing Arts Center (PAC) has a capacity for 1,600 and will play home to student performances. In addition to Esports Tournaments, it will also be used for rentals and community support programs. Technology highlights include the unRAVL Controls, which offer streamlined and intuitive control for rigging, AV, and lighting systems from a single touch panel. The PAC also has a large projection screen with a 30,000-lumen 4K laser projector, according to a project fact sheet.

The Blackbox Theater has a 120-seat capacity and will be used for arts education and performance spaces. It can also serve as the esports green room, as a professional education space, and a college-style lecture hall to prepare older students for university settings. The Blackbox Theater also uses the unRAVL System for rigging, audio, visual, and lighting solutions, the fact sheet reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • California District Opens New Robotics Center

    The Fremont Union High School District (FUHSD) in Cupertino, Calif., recently held a Grand Opening ceremony for a new, district-wide Robotics Center, according to a news release. The 14,500-square-foot facility was designed by Quattrocchi Kwok Architects (QKA); Landmark Constructors served as the builder and Blach Construction as general construction manager.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.

  • How Proactive Maintenance Can Transform Athletic Facilities into Strategic Assets for College Sports

    College athletics is entering one of the most transformative periods in its history. With NIL reshaping financial models and competitive expectations, athletic departments across the country are being asked to do more than ever with increasingly constrained resources.

  • Dallas-Area District Debuts Three New Facilities

    The Duncanville Independent School District in southwest Dallas, Texas, recently held ribbon-cutting ceremonies for three new facilities that resulted from a $170-million bond program passed in 2023, according to a news release.