LocknCharge Launches Smart Locker System for Device Management

LocknCharge, a developer of solutions for charging, storing, securing, and managing mobile technologies, has announced the FUYL Enhanced Smart Locker System, a software, hardware, and app-based kiosk solution for authenticated self-serve access to mobile devices with integrated device management.

The FUYL System includes:

  • Smart locker hardware (available in five-bay or 15-bay sizes) and optional accessories;
  • iOS-based Kiosk App for users to self-authenticate and access devices; and
  • Web-based portal for managing the system remotely, featuring workflows, identity management, single sign-on, and asset management functionalities.

The system's reporting tools offer a holistic view of device assignments, breakage rates, and more, LocknCharge explained in a news announcement. The company also provides comprehensive onboarding and ongoing technical and hardware support.

For more information, visit the LocknCharge site.

About the Author

Rhea Kelly is editor in chief for Campus Technology, THE Journal, and Spaces4Learning. She can be reached at [email protected].

Featured

  • Minnesota District Converts Middle School into Community Hub

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced the end of a major renovation project that converted a former middle school into a new centralized district and community hub, according to a news release.

  • Designing Third Spaces That Do What AI Can't

    In 2026, education is evolving faster than ever. With AI reshaping everything from lesson planning to personalized instruction, schools and universities are turning their attention to what AI can’t replicate: spaces that foster collaboration, community, and creativity.

  • Nashville Elementary School Receives LEED Gold Certification

    Goodlettsville Elementary School, part of Metro Nashville Public Schools in Nashville, Tenn., recently achieved LEED Gold Certification from the U.S. Green Building Council (USGBC), according to a news release. The 81,750-square-foot school opened in 2023 and was designed by Goodwyn Mills Cawood (GMC).

  • GeoCam and UCLA: Modernizing Campus Accessibility Mapping

    In early 2025, UCLA partnered with GeoCam to capture and modernize its pedestrian infrastructure data. The goal was ambitious but clear: to produce a high-accuracy, imagery-backed digital map of every sidewalk, pathway, ramp, and ADA-related feature on UCLA’s 419-acre campus.