Quam Launches Combination Paging and Fire Signaling Speaker

Commercial loudspeaker manufacturer Quam recently announced the release of its UL24 Series, a tile-replacement loudspeaker featuring both a paging speaker and a fire signaling speaker, according to a news release. The product was designed for educational, healthcare, and commercial markets both to save ceiling space and reduce the costs of installation.

“The main point of differentiation and focus for the UL24 Series is the labor savings of having one device in one location, providing dual applications,” said Quam Nichols President Randy Moore. “This product is transformative for systems integration projects in segments like education and healthcare, where ceiling space real estate is highly valuable.”

Key features and benefits include the dual functionality of a mass notification speaker connected to a fire panel and emergency communication system. The product is designed to fit a 2’x2’ lay-in ceiling tile space for efficiency. Its acoustic performance is boosted by two drivers and two different transformers. It also offers high durability and compliance with local fire codes. Finally, according to the news release, it can be installed within a ceiling tile grid in a matter of minutes.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Planning with Clarity: Using AI to Make Better Campus Decisions, Not Just Better Designs

    Higher education leaders are being asked to make increasingly high-stakes decisions about campus facilities amid greater uncertainty than ever before. Social and economic pressures, shifting enrollment, and evolving learning models compete with growing deferred maintenance needs to strain even the most robust infrastructure budgets.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Children walking along bright school corridor with motion blur

    How Next-Gen Design Is Reshaping the Student Experience

    The environments where students learn play a crucial role in shaping their growth in and out of the classroom. By centering design on well-being, flexibility, and purpose, districts can ensure their facilities remain vibrant community assets for many years to come.