IMETCO Releases IntelliWrap PR Roofing Underlayment

IMETCO recently announced the release of the IntelliWrap PR self-adhering roofing underlayment, which provides a water- and air-tight, vapor-permeable seal for roofing systems. The product was designed for steep slopes (2:12 or more) of standing seam metal, clay tile, slate tile, cedar shingle roofs, and more. The vapor permeability allows building materials to dry more quickly, reducing the odds of moisture infiltration and damage, according to a news release.

The IntelliWrap PR underlayment can withstand temperatures of up to 250°F and meets ASTM E2178 air-barrier resistance. It’s compatible with substrates including fiberglass-reinforced gypsum sheathing board, rigid insulation, plywood, steel, aluminum, galvanized metal, and OSB, the news release reports.

 “With its slip-resistant, UV-stable surface, the new IntelliWrap underlayment facilitates safe installation while offering a vapor-permeable barrier that allows the roof assembly to breathe,” said Jonnie Hasan, P.E., IMETCO director of engineering and sales support. “It bonds fully without the use of primers and is simple to install with no special tool requirements.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • Indiana Wesleyan University Schedules Grand Opening for New Welcome Center

    Indiana Wesleyan University recently announced that it will soon open a new Welcome Center on its campus in Marion, Ind., according to a news release. The facility will serve as the home base for prospective students and their families to learn more about the university and student life there. A ribbon-cutting ceremony is scheduled for February 19.