IMETCO Releases IntelliWrap PR Roofing Underlayment

IMETCO recently announced the release of the IntelliWrap PR self-adhering roofing underlayment, which provides a water- and air-tight, vapor-permeable seal for roofing systems. The product was designed for steep slopes (2:12 or more) of standing seam metal, clay tile, slate tile, cedar shingle roofs, and more. The vapor permeability allows building materials to dry more quickly, reducing the odds of moisture infiltration and damage, according to a news release.

The IntelliWrap PR underlayment can withstand temperatures of up to 250°F and meets ASTM E2178 air-barrier resistance. It’s compatible with substrates including fiberglass-reinforced gypsum sheathing board, rigid insulation, plywood, steel, aluminum, galvanized metal, and OSB, the news release reports.

 “With its slip-resistant, UV-stable surface, the new IntelliWrap underlayment facilitates safe installation while offering a vapor-permeable barrier that allows the roof assembly to breathe,” said Jonnie Hasan, P.E., IMETCO director of engineering and sales support. “It bonds fully without the use of primers and is simple to install with no special tool requirements.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Chartwells Launches Campus Dining Evaluation Framework

    Contract food-service management provider Chartwells Higher Education recently announced the launch of BLUEPRINT, according to a news release. The evaluation framework was designed to provide a data-driven and customizable roadmap towards optimizing campus dining services and, by extension, the student experience.

  • Miami University Approves New $242M Multipurpose Arena

    Miami University in Oxford, Ohio, recently announced that its Board of Trustees has approved construction of a new multipurpose arena at Cook Field, according to university news. The $242-million project will serve as a new centralized hub for student life and create space for economic development on campus.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.