Tennessee District Opens New Central Office

The Franklin Special District (FSD) in Franklin, Tenn., recently held a ribbon-cutting ceremony for its new 38,400-square-foot Central Office facility, according to a news release. The district partnered with Wold Architects and Engineers to create an administrative space designed to boost productivity, collaboration, and employee wellness. The two-story building will unite most district personnel beneath one roof.

The space will include amenities like a 2,800-square-foot assembly space with AV technology, a wellness area, an open-air courtyard, and loading and storage spaces. The project also included renovating an existing building into the 12,400-square-foot FSD Facilities and Transportation Center. The space features administrative offices, a meeting area, drivers’ lounge, maintenance space and equipment, and storage space.

“At Wold, our ultimate mission is to support the communities in which we live, work and play, and we could not be more grateful for our ongoing partnership with Franklin Special District that allows us to design spaces that bring this vision to life,” said Wold Architects & Engineers Principal Steve Griffin. “This new office blends modern functionality with timeless design, creating a space that not only enhances efficiency and collaboration but also reflects Franklin’s rich architectural heritage. Seeing this project complete is incredibly rewarding, and we’re proud to support a district that values innovation, community and staff well-being.”

FSD also partnered with Nabholz for construction management services, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • Classical building columns display digital data streams

    The Campus Nervous System: Why Facilities Risk Is Now a Leadership Issue in Higher Education

    Facility performance now intersects with safety, compliance, on-campus experience, institutional reputation, and financial resilience. That places it firmly on the leadership agenda.