Kraus-Anderson Continues Work in Minnesota School District

Maple River Schools in Mapleton, Minn., recently began construction on another project included in a district long-range facilities plan. Construction management firm Kraus-Anderson recently began work on two new classrooms and an outdoor track and field facility, according to a news release. The track facility will include a discus & shotput area, as well as a sand-jump pit.

The district partnered with ISG to design the project, which has an estimated completion date of July 2025. Funding comes from a $63.3-milllion bond referendum passed in February 2020, the news release reports.

As part of the same facilities plan, Kraus-Anderson recently completed the construction of Maple Rivers Schools, a K–12 school that covers four rural counties in Minnesota. The 200,000-square-foot campus includes three gymnasiums, a 500-seat auditorium, and a middle/high-school wing with specialized career-tech classrooms, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Southern Mississippi Starts Construction on Oyster Hatchery

    The University of Southern Mississippi (USM) recently announced that construction has begun on a new oyster hatchery at its Gulf Coast Research Laboratory (GCRL) Thad Cochran Marine Aquaculture Center (TCMAC) Cedar Point campus in Ocean Springs, Miss., according to a news release.

  • sapling sprouting from a cracked stone

    Lessons in Resilience: Disaster Recovery in Our Schools

    Facility managers play a pivotal role in how well a school weathers and recovers from a crisis. Whether it's a hurricane, a flood, a tornado, or a man-made event, preparation determines resilience.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

Digital Edition