Minnesota District Partners with Kraus-Anderson on Four Construction Projects

Stillwater Area Schools in Lake Elmo, Minn., recently announced a partnership with Kraus-Anderson for construction projects at four schools in the district, according to a news release. The projects’ funding comes from a $175-million referendum passed in November 2023. The projects include replacement facilities for Lake Elmo and Andersen Elementary Schools, an expansion at Oak-Land Middle School, and renovations to Stillwater Area High School.

The new, 150,000-square-foot Lake Elmo facility will include amenities like 53 flexible classrooms; breakout areas and collaboration space; and specialized areas for music, art, media, and special education. Outdoor amenities will include two kickball fields, playground spaces, and parking lots with dedicated traffic-flow direction, the news release reports.

Lake Elmo Elementary School Rendering
Image courtesy of Kraus-Anderson

Bayport Elementary, which will replace the existing Andersen Elementary, will measure in at 98,000 square feet and feature classroom pods, a learning commons, cafeteria, gym, and storm shelter.

Meanwhile, Oak-Land Middle School will see 64,699 square feet of additions, including a new gym and classroom spaces. The existing gym will be converted into a media center, and the existing media center into administration offices, according to the news release.

Lastly, Stillwater Area High School’s 10,910-square-foot project includes an office addition and renovations gym equipment, patient lift, interior partitions, floors, ceilings, roofing, and various maintenance improvements, the news release reports.

The district also partnered with Wold Architects and Engineers for the projects’ designs. Construction has an estimated completion date of August 2025.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.

  • Designing the Bridge Between Inclusivity and Independence in K–12 Schools

    Fostering independence is fundamental to learning and development for K–12 students. It offers many proven benefits, such as enhanced confidence, problem-solving, decision-making, and social skills. However, this foundational objective loses its impact if it’s not accessible and adaptable to all students. Inclusivity plays a critical role in cultivating independence and healthy autonomy for students, fostering positive student learning outcomes by uniting pedagogy with the physical learning environment.

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • Planning with Clarity: Using AI to Make Better Campus Decisions, Not Just Better Designs

    Higher education leaders are being asked to make increasingly high-stakes decisions about campus facilities amid greater uncertainty than ever before. Social and economic pressures, shifting enrollment, and evolving learning models compete with growing deferred maintenance needs to strain even the most robust infrastructure budgets.