Duncanville High School Breaks Ground on New CTE Building

Duncanville High School in Duncanville, Texas, recently held a groundbreaking ceremony for the newest addition to its campus, a Career and Technical Education (CTE) facility. The new building is part of a larger CTE expansion project for the school included in a 2023, $170-million bond program. The new facility itself will cost about $63.6 million and has an estimated completion date of July 2027, according to a news release.

The new addition will provide space for the district to “align and grow” the school’s CTE program, providing students with the skills and resources they need for higher education and workforce preparation, the news release reports.

“This project represents a significant investment in the future of Duncanville students,” said LAN’s vice president and business group director, JP Grom. “We are honored to partner with Duncanville ISD in delivering a facility that supports career pathways and creates new learning opportunities.”

The news release reports that Duncanville High School is the second-largest high-school campus in the U.S. Other renovations included in the bond program include architectural upgrades, roof and HVAC unit replacements, ADA compliance updates, and exterior upgrades.

The Duncanville Independent School District partnered with Lockwood, Andrews & Newnam (LAN) as program manager for the bond program.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Photo courtesy of Kraus-Anderson

    Concordia College Completes Memorial Auditorium Renovations

    Concordia College in Moorhead, Minn., recently completed a $2.5-million renovation project to Memorial Auditorium, a news release reports. The college partnered with Kraus-Anderson for the project’s construction and ICON Architectural Group for its design.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.