California District Starts Construction on New Robotics Facility

The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration. The district partnered with Quattrocchi Kwok Architects (QKA) for the project’s design and Landmark Construction for construction, with Blach Construction as construction manager.

The new building will replace portable buildings and makeshift classrooms around the district, providing amenities like field space; spectator seating; and workshop, classroom, and teamwork areas, the news release reports. In terms of designing to the space’s function, extra consideration was given to the building’s mechanical and electrical infrastructure, technology, controlled daylighting, acoustic roof deck, wall panels, and security systems.

“We are thrilled to create a dedicated space for our award-winning Robotics Teams, who consistently demonstrate exceptional creativity and skill,” said FUHSD Superintendent Graham Clark. “This new facility will ignite our Robotics Programs, fostering greater collaboration and further innovation. We want to thank the community and our project team for supporting this vision.”

Other design aspects include high ceilings for work and experimentation with aerial drones, as well as Electrostatic Discharge (ESD)-protected floors to prevent the buildup of static electricity between electronics and robots. The facility’s Wi-Fi infrastructure was also set up to avoid interference with robotic control systems, according to the news release. Exterior features include rooftop solar panels, an entry plaza, and outdoor workspaces.

“Designing a facility with such unique requirements presented its own challenges, but the collaboration with current and recent students, adult mentors and coaches was invaluable to our design process,” said QKA Principal Nick Stephenson. “Their firsthand insights directly shaped the project’s outcome, helping us create a facility that will greatly benefit and enhance their program.”

The building is scheduled to open to students at the beginning of the fall 2026 semester, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Homewood-Flossmoor High School NetZero Addition

    Homewood-Flossmoor High School NetZero Addition

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Homewood-Flossmoor High School NetZero Addition has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Porter Family Center

    Porter Family Center for Innovation and Academics

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Porter Family Center for Innovation and Academics has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Photo credit - Chuck Coates

    Florida District Modernizes Central Energy Plants at Two High Schools

    Flagler Schools, a public school district in Flagler County, Fla., recently partnered with Matern Professional Engineering to modernize the central energy plants at two of its high schools, according to a news release. The project is part of a larger, district-wide effort to reduce energy costs and operational expenses.