Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

Located near the existing Pipkin site, the new 114,750-square-foot facility will accommodate up to 725 students and is designed with collaborative learning spaces, modern technology integration, and enhanced security features. The project replaces the current Pipkin building, originally constructed in 1925 and suffering from extensive wear and outdated systems.

The school’s construction is part of the voter-approved Proposition S, a $220-million bond measure passed in 2019. In total, the bond supports the replacement or renovation of several SPS facilities, with Pipkin’s rebuild among the largest. Superintendent Grenita Lathan noted the project's alignment with districtwide goals of improving educational equity and modernizing learning environments.

The new school, being built on property formerly used for district facilities and maintenance, is slated for completion by fall 2026. Crossland Construction is serving as general contractor, with design by Paragon Architecture, according to the Springfield Daily Citizen.

With groundbreaking complete, the focus now shifts to foundational work and vertical construction, which is expected to accelerate throughout the summer. The project represents a key investment in the future of Springfield’s educational infrastructure and reflects broader trends in middle school design that emphasize flexibility, student well-being, and safety.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition