Tufts University Breaks Ground on Two New Residence Halls

Tufts University in Medford, Mass., recently broke ground on two new residence halls with a total capacity of 664 beds, according to local news. The project’s ultimate goal is to expand on-campus housing and reduce pressure on the local housing market. The university is partnering with Capstone Development Partners through a public-private partnership (P3) to develop, finance, and manage the new property, as well as with Elkus Manfredi Architects and Erland Construction.

The development will take over a former parking lot and cover 271,000 square feet. The two buildings will contain studio, two-, four-, and six-bedroom units with an additional 12,000 square feet of amenity space, including lounges, conference rooms, laundry rooms, a bike room, and fitness and study spaces. It will also feature 4,000 square feet of retail and social spaces on the lower floors, local news reports.

“Aided by the expertise of our development team, we’ve been able to reduce construction costs and time and bring to fruition a project that will enhance student life, benefit our neighbors, and enliven our streetscape—all in an environmentally responsible way,” said Tufts University Executive Vice President Mike Howard.

The buildings will be all-electric and were designed with improved indoor air quality, enhanced energy efficiency, and airtight envelopes at top-of-mind. Landscaping and other off-site improvements will help blend the new facility into the existing neighborhood.

“This is more than a residence hall—it’s a community-building project,” said Walker May, Executive Vice President of Capstone. “By creating affordable, high-quality housing on campus, we’re supporting students and the surrounding neighborhood.”

The new space is scheduled to open for the fall 2027 semester, local news reports, and upper-division students will receive leasing priority.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.

  • University of Pennsylvania Releases Design of Future Physical Sciences Building

    The University of Pennsylvania (Penn) in Philadelphia, Penn., recently released renderings of an upcoming 350,000-square-foot Physical Sciences Building, according to news release. The facility was designed by CO Architects and will unite the university’s departments of Physics and Astronomy, Mathematics, and Earth and Environmental Science.

  • UT-San Antonio Begins Residence Hall Renovations

    The University of Texas at San Antonio recently began a $6-million renovation project to one of its residence halls, according to a news release. Originally completed in 1986, Chisolm Hall measures in at 120,860 square feet and is the oldest and largest residence hall on campus.

  • California High School Opens New Classroom Building for 7th-, 8th-Graders

    Santa Rosa City Schools in Santa Rosa, Calif., recently announced the completion of a new classroom building for Piner High School. As the campus transitions to a Junior/Senior High School, the facility will play home to the school’s new population of seventh- and eighth-grade students.