California Middle School Completes Two New Academic Buildings

Sunnyvale Middle School in Sunnyvale, Calif., recently announced that construction is complete on two new classroom buildings of two stories each, according to a district news release. The new wing will house seventh- and eighth-grade students and is part of a larger campus modernization project. Quattrocchi Kwok Architects (QKA) and LPA, Inc., provided design services, while Blach Construction handled the build.

The two buildings add a total of 35,000 square feet, 23 adaptable classrooms, an art classroom, five student breakout spaces, a teacher collaboration area, and a 23,000-square-foot outdoor courtyard.

“I am grateful to our community for supporting our bond measures and making it possible to upgrade our school facilities. These improvements will directly enhance the learning experience for our students,” said Sunnyvale School District Superintendent Gudiel R. Crosthwaite. “I also want to thank our outstanding project team for staying on track with such an ambitious timeline. This allows us to make a meaningful difference for as many students as possible, as quickly as possible.”

The new wing is on track toward receiving a Collaborative for High Performance Schools (CHPS)-Designed certification. Design elements emphasizing sustainability include bioretention basins to capture and filter stormwater as well as solar panels as a source of renewable energy.

“Collaboration was key to bringing the stakeholders and design teams together to meet programmatic goals to deliver a project ready for students to start the school year,” said LPA, Inc., senior project manager Denise Flatley. “Locating the buildings to create a courtyard that connects to Spartan Square, leaving space for the future growth of the campus by utilizing two-story buildings, and emphasizing the need for interior and exterior learning space for the social and emotional growth of the students were our top priorities. The result is a student centric space we are excited to see students use daily.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Myrtle Grove Elementary

    Phased Construction Keeps Students on Campus During Rebuild

    When Escambia County School District needed to replace most of Myrtle Grove Elementary School in Pensacola, Fla., it had three distinct challenges: honor the school's legacy in the community, bring state-of-the-art learning environments to the county, and be seamlessly built on the same site as the active school campus.

  • FGCU Breaks Ground on New Health Sciences Building

    Florida Gulf Coast University (FGCU) has launched construction on a major new academic facility that leaders say will reshape healthcare education in Southwest Florida for decades to come, according to university news.

  • Baton Rouge Center for Visual and Performing Arts

    Baton Rouge Center for Visual and Performing Arts

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Baton Rouge Center for Visual and Performing Arts has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.