Tennessee State University Gains Approval for New Engineering Facility

Tennessee State University in Nashville, Tenn., recently announced that it has received approval from the Tennessee State Building Commission to build a new engineering building on campus, according to a university news release. The 70,000-square-foot, $50-million facility will play home to the university’s engineering programs and the Applied & Industrial Technology program, providing a consolidated complex for innovation, research, and collaboration. Construction will begin later this year and has an estimated completion date of summer 2027.

“Over the years, our college has experienced significant growth in students, faculty, research, and academic programs,” said Dr. Lin Li, Dean of the College of Engineering. “This facility will provide a world-class space that enhances interdisciplinary collaboration across six undergraduate programs, three master’s programs, and one Ph.D. program. It will also host innovative engineering activities that directly benefit the metro Nashville area and Middle Tennessee.”

The facility features classrooms; computer labs; and a combined total of 30 teaching and research labs, including a Future Energy Lab, Drone Flight and Air Traffic Lab, and an Additive Manufacturing Lab, the news release reports. The university partnered with Melvin Gill & Associates and Bauer Askew Architecture for the project’s design.

“The new engineering building is the first step in elevating Tennessee State University’s engineering program to meet the demands of industry and the state of Tennessee,” said Will Radford, the university’s assistant vice president of Planning, Design, and Construction. “By establishing new partnerships and providing modern facilities, we are positioning TSU engineering students to not only keep pace but to set standards in the industry.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Spaces4Learning Launches 2026 Facilities and Construction Brief Survey

    Spaces4Learning recently launched the 2026 Facilities and Construction Brief Survey, which collects data on the previous year’s K–12 and higher education construction projects nationwide.

  • Colorado School District Breaks Ground on Unified PK–12 Campus

    The Haxtun School District No. Re-2J in Haxtun, Colo., recently announced that ground has been broken on a renovation/addition project that will unite its two schools, Haxtun Elementary and Haxtun Jr/Sr High School, according to a news release.

  • Arlington High School

    Arlington High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Arlington High School has been recognized with an EDS 2026 Grand Prize award in the category of New Construction.