Texas State University Completes Stadium Renovations

Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house. The university partnered with Pfluger Architects and White Construction on the project.

Field house upgrades include the addition of an 8,000-square-foot weight room and a 3,000-square-foot training room. The new End Zone Complex features amenities for player wellness and development including in-ground hydrotherapy, cold-plunge pools, locker room upgrades, and meeting spaces, the news release reports.

“The university’s vision to have a facility to help student-athletes reach their full potential drove our design, putting player and team wellness at the forefront,” said Pfluger Architects’ Chris Lammers, AIA, project manager and Higher Education Practice Director. “Everything in the space planning, design, and programmatic needs was driven by efficiency and maximizing every minute to make Texas State’s players better athletes. We designed the stadium addition to fit seamlessly into the rest of campus and the existing stadium, unifying elements across the board.”

Other facility features include a players’ lounge, lobby and community area, and a hospitality suite that opens onto a rooftop terrace overlooking the stadium. A new Grand Central hallway connects the complex to other stadium facilities, while an expanded concourse bridge connects the terrace to the rest of the facility.

The project began in 2020 and was completed at the beginning of the fall 2025 semester, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.

  • Philadelphia Middle School Facility Earns LEED Gold Certification

    The Alternative Middle Years (AMY) at James Martin Middle School in Philadelphia, Penn., recently received a LEED Gold certification from the U.S. Green Building Council, according to a news release. The School District of Pennsylvania partnered with KSS Architects on the project.

  • Wenger Names New Vice President of Sales for Performing Arts, Controls

    Wenger Corporation, which provides products and solutions for music and theater education, performing arts and athletic storage, recently announced the hiring of a new Vice President of Sales for Performing Arts and Controls.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.