Texas State University Completes Stadium Renovations

Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house. The university partnered with Pfluger Architects and White Construction on the project.

Field house upgrades include the addition of an 8,000-square-foot weight room and a 3,000-square-foot training room. The new End Zone Complex features amenities for player wellness and development including in-ground hydrotherapy, cold-plunge pools, locker room upgrades, and meeting spaces, the news release reports.

“The university’s vision to have a facility to help student-athletes reach their full potential drove our design, putting player and team wellness at the forefront,” said Pfluger Architects’ Chris Lammers, AIA, project manager and Higher Education Practice Director. “Everything in the space planning, design, and programmatic needs was driven by efficiency and maximizing every minute to make Texas State’s players better athletes. We designed the stadium addition to fit seamlessly into the rest of campus and the existing stadium, unifying elements across the board.”

Other facility features include a players’ lounge, lobby and community area, and a hospitality suite that opens onto a rooftop terrace overlooking the stadium. A new Grand Central hallway connects the complex to other stadium facilities, while an expanded concourse bridge connects the terrace to the rest of the facility.

The project began in 2020 and was completed at the beginning of the fall 2025 semester, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • New City School

    Turning Crisis into Opportunity: Transforming New City School

    When New City School in St. Louis suffered catastrophic flood damage in July 2022, the event could have marked a serious setback for the 100-year-old institution. Instead, it became a forward-looking opportunity.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • Spaces4Learning Launches 2026 Education Design Showcase Awards

    Spaces4Learning has opened submissions for the 2026 Education Design Showcase! The awards program launched in 1999 with the goal of celebrating innovative, practical solutions in the planning, design, and construction of K–12 and higher-education facilities. EDS recognizes new developments that help achieve optimal learning environments, as well as the architecture firms that brought the ideas to life.