Lewis C. Cassidy Elementary School

Grand Prize, New Construction | 2025 Education Design Showcase

EwingCole

Project Information

Facility Use: K-12 Institution
Project Type: New Construction
Category: Whole Building / Campus Design
Location: Pennsylvania
District/Inst.: School District of Philadelphia
Chief Administrator: Herman Douglas
Completion Date: 8/16/2024
Gross Area: 83,000 square feet
Area Per Student: n/a
Site Size: 1.9 acres
Current Enrollment: 232
Capacity: 570
Cost per Student: n/a
Cost per Sq. Ft.: $665
Total Cost: $55,200,000

Designed to set a new standard for education in Philadelphia, Lewis C. Cassidy Elementary School is a dynamic, LEED Gold-designed K-8 facility that supports 21st-century learning while fostering deep community connections. The 83,000-square-foot school serves 570 students and replaces an outdated early 20th-century building with a flexible, technology-integrated environment tailored for modern pedagogy.

The design overcomes the previous school's spatial and technological limitations by incorporating collaborative learning spaces, a central student common ("the canyon"), and a state-of-the-art media center. The layout maximizes daylight, improves circulation, and supports diverse learning styles with specialized STEAM-focused classrooms, maker spaces, and a discovery common. Biophilic design and intuitive color-coded wayfinding buttresses the welcoming, inspiring environment.

The design prioritizes safety and security through thoughtful planning. Open sightlines throughout the building and grounds enhance natural surveillance and mitigate risk. Spaces encourage positive social interaction, reducing behaviors such as bullying. Controlled entry points and secure pathways protect students while maintaining accessibility for community use.

Outdoor areas extend learning beyond the classroom, with a biophilic playground, a green roof, and stormwater gardens that enhance sustainability and student wellness. Community engagement is central to the design, ensuring the school's assembly spaces, gymnasium, and outdoor areas serve as neighborhood assets.

By prioritizing inclusivity, sustainability, and innovation, Cassidy Elementary establishes itself as a "school of choice," shaping the future of education in Philadelphia while enriching the surrounding community.

Architect(s):

EwingCole
215-923-2020

Featured

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • Academy of Classical Education Breaks Ground in Louisiana

    Charter Schools USA (CSUSA) recently announced the groundbreaking of a new public charter school in Covington, La., according to a news release. The Academy of Classical Education at Covington will enroll students in grades K–8 and is scheduled for completion in August 2026, just in time for the new school year.

  • Fargo, N.D., Starts Construction on Consolidated Elementary School

    Fargo Public Schools in Fargo, N.D., recently announced the beginning of construction on a new elementary school, according to a news release. The district partnered with ICON Architectural Group and Kraus-Anderson Construction on the new Horace Mann Elementary School.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.