California K–12 District Completes Elementary School Campus Replacement

The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade. The district partnered with Quattrocchi Kwok Architects and Alten Construction for the build, which was funded by Bond Measure R.

“This campus marks a new era for our students and the entire community,” said Cheryl Cotton, district superintendent. “These facilities are a source of immense pride, replacing buildings that were no longer up to code or capable of supporting our educational programs. The campus now provides students and staff with the essential resources they need to thrive. Thank you to the project team and the community for your support in bringing our new school to life.”

Lake Elementary School exterior
Image courtesy of Quattrocchi Kwok Architects

The 56,700-square-foot campus uses a “Learning Suite” concept, grouping individual classrooms around open, flexible spaces, according to the news release. Amenities include a library, administrative space, and a multi-purpose building with a kitchen and cafeteria. Improvements to the outdated and undersized campus involved high-elevation, synthetic turf fields and paved play areas.

“We are proud to partner with the district and Alten to make the new Lake Elementary School a reality,” said John Dzbczak, QKA Principal. “Our priority was ensuring a safe learning environment both during the complex phases of construction and for generations of students to come.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • Classical building columns display digital data streams

    The Campus Nervous System: Why Facilities Risk Is Now a Leadership Issue in Higher Education

    Facility performance now intersects with safety, compliance, on-campus experience, institutional reputation, and financial resilience. That places it firmly on the leadership agenda.