Hawaii Elementary School Breaks Ground on New Classroom Building

Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses. The district partnered with Urban Works, Inc., for the project’s design, the West Hawaii District Office for construction management services, and Nan Inc. for construction.

“This building has been a bridge, literally and figuratively, connecting the school, partners and our students’ education,” said Keith Hayashi, district superintendent. “From the support of Sen. Dru Kanuha and Rep. Nicole Lowen to the new DAGS district office and the designers who offered a solution that met school needs within site constraints, we are looking forward to this new building connecting the upper and lower campus and elevating the learning environments for students, teachers and staff.”

The facility will include four classrooms, an outdoor classroom, special education classrooms, a covered learning lanai, administrative space, and storage rooms, the news release reports. The new building will connect to existing buildings via two pedestrian bridges. Design features include neutral tones to blend with the natural landscape, as well as copper roofing, colored building outcroppings, and Hardie clapboard siding to give the school a lived-in, homey feel.

“We are grateful to the legislature and Governor Green for supporting the effort of creating a second district office on Hawaiʻi Island. Given the long travel times from Hilo to Kona, it was evident a second office was needed to properly service our schools and DAGS-managed facilities in West Hawaiʻi,” Keith Regan, comptroller and DAGS director, said. “It’s thanks to this support that we now have a highly skilled and motivated district engineer in place in West Hawaiʻi who has positively impacted our support of the DOE and our other operations.”

The building has an estimated completion date of Sept. 2027, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Wenger Names New Vice President of Sales for Performing Arts, Controls

    Wenger Corporation, which provides products and solutions for music and theater education, performing arts and athletic storage, recently announced the hiring of a new Vice President of Sales for Performing Arts and Controls.

  • Montclair State University Debuts New VR Facility

    Montclair State University in Montclair, N.J., recently announced the completion of a new virtual reality learning facility developed in partnership with Dreamscape Learn, according to a news release. The 2,450-square-foot lab space is inside the College of Communication and Media building and will serve students pursuing careers in digital media, virtual reality, and content creation.

  • Phoenix High School Completes First Phase of Campus Renovations

    Metro Tech High School, part of the Phoenix Union High School District (PXU) in Phoenix, Ariz., recently announced the completion of the first stage of a campus renovation project, according to a news release. The school reopened a series of public-facing business operations spaces including credit union, daycare, floral, cosmetology, and culinary services. It also includes new CTE learning spaces for the school’s nursing assistant, pharmacy, and sports medicine programs.

  • Georgia State University Opens New Research Tower

    Georgia State University in Atlanta, Ga., recently held a ribbon-cutting ceremony for a new, nine-story, 155,000-square-foot Research Tower, according to university news. Amenities include academic classrooms, a large lecture space, teaching labs, faculty research space, and the uppermost floors reserved for future expansion.