New Arizona Fine Arts School Reaches Construction Milestone

Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam. The district partnered with McCarthy Building Companies and ADM Group on the 115,111-square-foot facility.

Amenities are set to include two one-level classroom buildings and a two-story facility with a black box theater, cafeteria, administrative space, a media center, and more classroom space. The campus will also feature a 34,034-square-foot performing arts center including front-of-house space, a lobby, seating capacity of more than 700, and a back-of-house area with flex space and a food service area, according to the news release.

“The beam represents more than steel and signatures,” said Kristen Acton, Governing Board President for AFHSD. “It symbolizes our shared commitment to students, families, and this community. Every decision behind this project was made with learning, opportunity, and long-term impact in mind.”

Construction started in May 2025 and has an estimated completion date of fall 2026, and the full project cost about $74.5 million. McCarthy Building Companies served as general contractor, and ADM as designer.

“Most of all, we can’t wait to have students walk through these doors,” said Julie Jones, Hilltop School for the Arts and Theater Principal. “And as we sign this beam today, I am reminded that it is their courage to create, perform, and grow that is the heart of Hilltop. They are the ones who inspire us and remind us why this work matters.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Colorado School District Breaks Ground on Unified PK–12 Campus

    The Haxtun School District No. Re-2J in Haxtun, Colo., recently announced that ground has been broken on a renovation/addition project that will unite its two schools, Haxtun Elementary and Haxtun Jr/Sr High School, according to a news release.

  • GeoCam and UCLA: Modernizing Campus Accessibility Mapping

    In early 2025, UCLA partnered with GeoCam to capture and modernize its pedestrian infrastructure data. The goal was ambitious but clear: to produce a high-accuracy, imagery-backed digital map of every sidewalk, pathway, ramp, and ADA-related feature on UCLA’s 419-acre campus.

  • Tennessee Middle School Completes Health, Life Safety Renovations

    The Giles County Board of Education in Pulaski, Tenn., recently announced that a series of renovation projects has been completed at Bridgeforth Middle School, according to a news release. The district partnered with Wold Architects & Engineers and Brindley Construction to modernize building systems at one of the district’s oldest schools.

  • Wold Architects & Engineers Announces Acquisition of JJCA

    Wold Architects & Engineers, based in Minneapolis, Minn., recently announced that it has acquired JJCA, an architecture firm based in Nashville, Tenn., according to a press release. JJCA specializes in healthcare and education design; the partnership allows both firms to expand their presence across the country while building on existing strengths.