Harvard Announces Replacement Facility for Native American Program

Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP)—both its academic and social components. The building will open in time for the 2027–28 school year.

Amenities will include offices, reception and recreation lounges, kitchens, a conference room, and a covered front porch and rear deck. The basement will play home to storage and mechanical space, and outdoor areas will provide space for cultural programming and ceremonies, the news story reports.

HUNAP’s current facility was built in 1873 and acquired by the university in 2023. A feasibility review found that the building’s structure was deteriorated beyond hope of renovation and that renovating the existing structure would “essentially require the construction of a new building within the shell of the existing building,” according to the Harvard Crimson.

HUNAP is a multi-school initiative within the university whose work encompasses “Native American studies, history, and cultural engagement, including academic programming, community events, research and travel grants, and tribal diplomacy efforts.” The facility’s design will invoke Native materials and symbolism; the exterior façade draws inspiration from tree bark and wampum.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Baton Rouge Center for Visual and Performing Arts

    Baton Rouge Center for Visual and Performing Arts

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Baton Rouge Center for Visual and Performing Arts has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Spaces4Learning Launches 2026 Facilities and Construction Brief Survey

    Spaces4Learning recently launched the 2026 Facilities and Construction Brief Survey, which collects data on the previous year’s K–12 and higher education construction projects nationwide.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.