Moline-Coal Valley School District to Consolidate Two Schools into New Facility

The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School, and it will have the capacity for 600 students in grades K–5.

Construction will consist of a 61,000-square-foot addition and 32,000 square feet of renovations to the existing Lincoln-Irving facility, local news reports. The project has an estimated completion date of fall 2027 and will cost $33.8 million.

“This is an incredible honor and moment of great pride and lasting significance that we all gather here today to officially dedicate this school and honor an extraordinary man,” said Chris Ontiveros, son of the building’s namesake, during the groundbreaking ceremony. “To name a school after an individual places their values permanently into the foundation and education itself and ensures that every student walks through these doors is reminded every single day of the power of character, work ethic, integrity and service. These are the very same qualities that my father portrayed and acted every single day of his life.”

The district partnered with Legat Architects for the project’s design and Estes Construction for its construction. During renovations, the students and staff of Lincoln-Irving will move to Western Illinois University through the end of the 2026–27 academic year.

“This project is more than a building,” said Jeff Sandberg, Legat Architects CEO. “It represents opportunity, growth and a commitment to the next generation of the community. By bringing Lincoln-Irving and Willard together into one unified environment, we're creating a space designed to support collaboration, innovation and student success.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Pitzer College

    Designing for Change in Higher Ed Learning Environments

    Higher education will continue to evolve, and learning environments must evolve with it. By prioritizing adaptable infrastructure, thoughtful reuse, strong energy performance, and wellness-centered design, campuses can create spaces that support learning today while remaining flexible for the future.

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Campus Safety Requires Using Every Resource Available

    Across the U.S., school and campus leaders are facing a security landscape that has changed dramatically over the past decade. Incidents on school property have increased in recent years, with several consecutive years setting record totals. According to analysis of data by CNN, dozens of shootings now occur on school grounds annually across K-12 and higher education environments.