Phoenix School District Breaks Ground on New Prep Academy

The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles. The district partnered with SPS+ Architects for the building’s design and McCarthy Building Companies, Inc. for construction, which has an estimated completion date of winter 2027.

The new campus will feature a new administration and cafeteria building, as well as a two-story classroom building for students. The academy uses a dual-immersion teaching model, in which students transition from English to Spanish during the week, and spaces were designed using colors and textures to mark the language of instruction, the news release reports.

A two-story middle-school building will play home to students in grades 6–8. Amenities will include a media and learning center, STEM labs, a maker space, and dedicated spaces for arts and music. Finally, an amphitheater-style staircase (the “learning stair”) will offer a flexible commons space for reading, group work, and collaboration.

“We couldn’t be more thrilled to officially break ground and bring this campus rebuild to life,” said Paul Kubik, Project Director with McCarthy. “McCarthy has had the honor of walking these halls, supporting this campus, and being a part of this community for years, and we are excited about this next chapter for BPA. Every time we take on a campus rebuild, we have the privilege of becoming ingrained into the school’s culture, and that runs especially deep here. The dual immersion culture is one of the core features of Biltmore Prep, and we’re beyond excited to celebrate and honor that identity through every space we build.”

Finally, the redesign will take advantage of the existing multipurpose gym facility as a central hub for students. The four buildings will frame a central courtyard featuring a large outdoor learning stair that can serve as a space for outdoor classes, assemblies, student performance, and parent-teacher events, the news release reports.

The new facility will expand the school’s capacity from about 500 students and 60 staff to about 750 students and 75 staff.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Wenger Names New Vice President of Sales for Performing Arts, Controls

    Wenger Corporation, which provides products and solutions for music and theater education, performing arts and athletic storage, recently announced the hiring of a new Vice President of Sales for Performing Arts and Controls.

  • Haws Corporation Marks 120th Anniversary

    Haws Corporation, which provides hydration and emergency safety solutions worldwide, recently announced that the company is celebrating its 120th anniversary this year, according to a news release.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.