California Middle School Breaks Ground on Major Renovation Project

The Hillsborough City School District (HCSD) in Hillsborough, Calif., recently began construction on new multipurpose and administration facilities for Crocker Middle School, according to a news release. The project’s goal is to modernize outdated facilities. The district partnered with Quattrocchi Kwok Architects (QKA) for design, Blach Construction for building services, and Van Pelt Construction Services for program and construction management.

The Multipurpose Building (MPR) will include a raised performance space, meal server, and warming kitchen. The facility’s retractable back wall will open into a new outdoor courtyard, which can play home to student lunches and performances, school events, and community activities, the news release reports.

"We are thrilled to begin construction on these new facilities, a critical investment for our students and staff," said Ana de Arce, HCSD Superintendent. "These modern and adaptable spaces will provide the backbone by which the campus functions, reflecting the district’s dedication to our community’s future. We would like to thank the community for its support of local bond measures that make facilities upgrades a reality, as well as our dedicated project team.”

The new Administration Building, attached to the MPR via a covered walkway, will have administrative offices, a nurse’s station, and a reception area, according to the news release. It will also feature its own courtyard and partial roof terrace for additional flexible outdoor space.

"Alongside HCSD, Blach and Van Pelt, we are honored to contribute to this project that will replace some of the school’s more outdated facilities with contemporary, flexible, and cohesive environments,” said Lyanne Schuster, QKA principal and studio lead. “These new facilities are designed to foster collaboration and gathering, ensuring the long-term success of the Crocker Middle School campus."

The project entails 17,000 square feet of new construction and was funded by Local Bond Measure H. It has an estimated completion date of winter 2027.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Sam Houston State University Completes Athletic Stadium Renovations

    Sam Houston State University in Huntsville, Texas, recently announced the reopening of Elliott T. Bowers Stadium after an extensive renovation project, according to a news release. The university partnered with Stantec and DLR Group for the project’s design.

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • UT-San Antonio Begins Residence Hall Renovations

    The University of Texas at San Antonio recently began a $6-million renovation project to one of its residence halls, according to a news release. Originally completed in 1986, Chisolm Hall measures in at 120,860 square feet and is the oldest and largest residence hall on campus.