Dallas-Area District Debuts Three New Facilities

The Duncanville Independent School District in southwest Dallas, Texas, recently held ribbon-cutting ceremonies for three new facilities that resulted from a $170-million bond program passed in 2023, according to a news release. The district partnered with Lockwood, Andrews & Newnam, Inc. (LAN) as program manager for the Duncanville High School Career and Technical Education (CTE) Addition, the Clint Q. Smith Early Learning Academy, and the Central Fine Arts Academy.

"These projects represent an important investment in Duncanville ISD's future,” said Tim Strucely, AIA, NCARB, LEED AP,  LAN senior program manager. “Each facility was designed to meet a different educational need, and together they will serve students from their earliest years through career readiness.”

The Duncanville High School CTE Addition included 36,000 square feet of new construction and renovations to the existing CTE space. The new facility supports 24 CTE programs including culinary arts, robotics, architecture, cosmetology, broadcasting, and more.

The Clint Q. Smith Early Learning Academy measures 46,389 square feet and comes from renovations to the former home of Smith Elementary School. The facility is designed for pre-kindergarten students and supports “play-based learning, language development and social-emotional growth” in a “purpose-built environment,” the news release reports.

Finally, Central Fine Arts Academy is the product of renovations to Central Elementary School and covers 52,186 square feet. Work included building system upgrades, accessibility accommodations, and learning spaces designed specifically for visual and performing arts classes.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • William Penn Charter School

    Richard A. Balderston OPC’69 Lower School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Richard A. Balderston OPC’69 Lower School has been recognized with an EDS 2026 Grand Prize award in the category of New Construction.

  • Classical building columns display digital data streams

    The Campus Nervous System: Why Facilities Risk Is Now a Leadership Issue in Higher Education

    Facility performance now intersects with safety, compliance, on-campus experience, institutional reputation, and financial resilience. That places it firmly on the leadership agenda.

  • Planning with Clarity: Using AI to Make Better Campus Decisions, Not Just Better Designs

    Higher education leaders are being asked to make increasingly high-stakes decisions about campus facilities amid greater uncertainty than ever before. Social and economic pressures, shifting enrollment, and evolving learning models compete with growing deferred maintenance needs to strain even the most robust infrastructure budgets.

  • Arlington High School

    Arlington High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Arlington High School has been recognized with an EDS 2026 Grand Prize award in the category of New Construction.