California District Opens New Continuation High School

The Fort Bragg Unified School District (FBUSD) in Fort Bragg, Calif., recently held a ribbon-cutting ceremony for Noyo High School, a continuation high school that provides alternative education options for students in grades 6–12, according to a news release. The district partnered with Quattrochi Kwok Architects for design and FRC Inc. for construction, and the project’s funding came from Local Bond Measure B.

The campus consists of three one-story buildings designed to support individual growth and hands-on learning. Academic amenities include classrooms, a Maker Space, outdoor athletic facilities, and open collaboration areas. It also includes an administrative and student services hub featuring conference spaces, a kitchenette, shower, and laundry facilities for students who may not have those resources at home., the news release reports.

"The opening of this campus is a direct reflection of our community's deep commitment to our students," said Joseph Aldridge, FBUSD superintendent. "This investment ensures that every student, regardless of their learning style or educational path, has access to a high-quality, modern environment built to support their individual journey to graduation and beyond."

The Maker Space features equipment and technology for skill development in fabrication, music, art, and filmmaking, according to the news release. According to the news release, “By pairing student-centered architecture with personalized learning, the new facility better serves students who need an alternative to traditional learning settings, improving graduation rates while empowering every learner to build confidence, pursue their passions, and achieve lifelong success.”

"Designing spaces that support alternative learning pathways is immensely rewarding," said QKA Principal Kevin Chapin. "Our goal for Noyo High School was to create an inviting, adaptable campus built entirely around student-centered learning and growth, providing every young person with the tools they need to succeed."

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Wold Completes Geothermal Projects at Two Minnesota Schools

    Wold Architects & Engineers recently announced that it has completed two geothermal expansion projects for Mounds View Public Schools in Shoreview, Minn., according to a news release. The work at Highview Middle School and Irondale High School serves the district’s long-term goal of reducing energy costs and dependency on non-renewable fuel sources, as well as improving building performance.

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.

  • California District Debuts New High-School CTE Center

    The West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently held a ribbon-cutting ceremony for the new CTE Center at Analy High School, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) for the facility’s design and GCCI for its construction, and funding came from local Measure A bond funds.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.