How Inflation, Experience Gaps, and AI Are Reshaping Education Construction and Cost Control

Scott Creekmore, VP of Customer Engagement at Gordian, explains how Gordian evolved from Job Order Contracting into planning tools for facility condition assessments and asset recapture, plus estimating through RSMeans price data. He outlines major challenges facing education construction today: rapid inflation driven by geopolitics, an industry-wide experience gap as seasoned professionals retire without enough backfill, and resulting cost-control volatility where prices swing dramatically over short periods. Creekmore describes how advancing technology—especially AI—along with CMMS and cost-tracking software can help agencies do more with less by improving scope detail, reducing change orders, tracking labor on site, and enhancing cost benchmarking and predictive insights, including regional price differences. He also advocates for longer-term planning, economies of scale, and reexamining procurement laws and options such as cooperative purchasing and job order contracting to improve cost control.

00:00 Meet Scott and Gordian
00:22 Gordian Origins and Services
01:14 Industry Challenges Today
03:14 Tech Trends and AI Tools
05:11 AI for Better Scopes
07:42 Long Term Planning in Education
09:22 Smarter Procurement and Cost Control
10:05 Closing Thoughts

Additional resources:

Sponsored by Gordian

Featured

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.