Construction


workers on lift cleaning windows

From Cradle to Grave: The Cost of a Building

When a system shows signs of failing, what is the most cost-effective course of action an owner should take? Does the owner replace the system or close the facility?

Carl H. Lindner School of Business at the University of Cincinnati

Future-Oriented and Sustainable: Business Schools of the Future

How can good design contribute to better campus life? The opening of the Carl H. Lindner College of Business at the University of Cincinnati unlocked a new view to the future.

New Fairfield Public Schools recently selected JCJ Architecture to design two new school projects — the expansion of the Grades 3 through 5 Meeting House Hill School and a new high school.

New Fairfield Schools Select JCJ Architecture for New Projects

New Fairfield Public Schools recently selected JCJ Architecture to design two new school projects — the expansion of the Grades 3 through 5 Meeting House Hill School and a new high school.

The new $10.7 million, 15,000-square foot facility creates a multifunctional events center for the campus. The two buildings will accommodate theater productions, band performances and other events, as well as a drama classroom, band and orchestra suite and dance studio.

Construction Completed on El Capitan High School’s Events Center

Construction has been completed on the new $10.7 million, 15,000-square-foot event center for Grossmont Union High School District’s El Capitan High School in Lakeside, California.

At the heart of the school is the two-story media center, designed to blur the lines between indoor and outdoor space.

Reach for the Stars: Designing a STEM Elementary

De Soto ISD’s Katherine Johnson Technology Magnet Academy aims to spark curiosity at an early age through STEM education.

The new two-story, 68,000-square-foot building is estimated to cost $15 million. The school, designed and constructed by LAI Group, is expected to be finished by summer 2020.

Athenian Charter School Breaks Ground In Florida

The new two-story, 68,000-square-foot building is estimated to cost $15 million.

New York STEAM Pre-K Center Begins Construction

The center will focus on early childhood STEAM education, offering a first of its kind in New York City.

NY Officials Break Ground on Staten Island School

The school is expected to serve more than 750 students in Pre-K through fifth grade when it opens in the 2022-2023 school year.

Turnkey Renovation Solutions for A+ Aesthetics

A few solutions to minimize renovation costs and support sustainablity goals.

New Missouri Elementary Features Collaborative Spaces for Each Grade Level

The new, two-story elementary school will replace South Point Elementary and is funded by Prop S, a $26 million bond issue approved in April.

The $15 million building renovation was part of Mayor Walsh’s $2.08 billion Imagine Boston Capital Plan. It was the final phase of an overall $33 million project to two Eliot school buildings.

Innovative Boston School Officially Opens in North End

The $15 million building renovation was part of Mayor Walsh’s $2.08 billion Imagine Boston Capital Plan. It was the final phase of an overall $33 million project to two Eliot school buildings.

Digital Edition