U Central MO Gets "Living Room" Makeover

The University of Central Missouri has gone public with an update on a multi-year masterplan for renovating the Elliott Student Union, dubbed as the "campus living room," by the university's community. The student union is a 165,000 square-foot social hub that includes study areas, meeting spaces, student service offices, retail dining, a movie theater, a bowling center, a campus card center, bank and information desk.

The new entrance for the University of Central Missouri's student union includes seating, a graphic timeline and a digital wayfinding kiosk. Source: KWK Architects

After the 15-to-20-year masterplan was completed, the architects provided projections on expected costs for each phase of the renovation project. The goal was to update the central atrium as the primary student area, convert underused spaces, support the evolution of student services and improve the overall visitor experience.

Phase 1 of the plan encompassed a $7 million redesign that includes a new main entrance, finished in fall 2019, and the addition of a 280-seat multi-purpose auditorium, done in spring 2020. Besides making access to the whole of the facility more obvious, the new entrance was also designed to incorporate seating, a graphic wall timeline, entry signage and a digital wayfinding kiosk.

The new 5,700-square-foot auditorium has a stage and retractable seating, and entry into the space was made available through the new entrance hallway.

Design services were provided by higher-education-focused KWK Architects working with solution design firm CannonDesign. Renovations were handled by Missouri-based Westport Construction Co.

"The team analyzed existing conditions and held multiple workshops, meetings and a town hall to gain stakeholder input," said KWK Principal Eric Neuner, in a statement. "We explored various design options to best meet the university's vision for how the facility would look and feel and how its space would best be utilized."

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Chicago District Completes Construction on New Elementary School

    North Chicago School District 187 in North Chicago, Ill., recently held a ribbon-cutting ceremony for the new Forrestal Elementary School, according to a news release. The new school marks a major investment in military-connected students and families at Naval Station Great Lakes.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.

  • abstract illustration of school gym

    How the Gymnasium Can Serve as a Model for Learning Space Design

    Multipurpose gyms work because flexibility was built into the brief from the start, not retrofitted later. The same logic applies to academic spaces.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.