ABM Offers $3.7M in Energy Savings to Georgia School District

Facility solutions provider ABM recently announced that it will be partnering with the Dooly County School System in Vienna, Ga., to form an Energy Performance Contracting program. The program will save the school district about $3.7 million in energy and operating cost savings over the next 20 years, according to a press release. The savings will come primarily from energy-saving infrastructure solutions and custodial and maintenance services.

“Our students deserve state-of-the-art facilities,” said Dooly County School System Superintendent Dr. Craig Lockhart. “This project, through an innovative solution, helps our community achieve more for each school, to perpetuate success for every student.”

The energy savings and reduction in operating costs will come through improved lighting, HVAC equipment, and controls at the district’s K–8 Academy and high school. It will also offer larger space for bus maintenance and upgrades to student athletic facilities such as additional bathrooms, new lighting, and improved playing surfaces. The project will also entail installing a new roof for the high-school gymnasium and a reconfigured HVAC system to extend the roof’s life and offer interior climate control.

“We not only improve infrastructure through projects like this for our clients, but we also protect and preserve those investments for students, teachers, and staff with ongoing maintenance and custodial services,” said ABM President of Education Valerie Burd.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • ZeroEyes, Academic Innovators Partner to Provide Safety Solutions

    ZeroEyes, which produces a multi-analytics weapons detection and threat intelligence platform, recently announced a partnership with Academic Innovators, according to a news release.

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.

  • UPenn Announces Completion of New Veterinary Education Facility

    The University of Pennsylvania in Philadelphia, Penn., recently finished construction on an 11,800-square-foot veterinary education building, according to a news release. The Gail P. Riepe Center for Advanced Veterinary Education is the first dedicated classroom facility at the New Bolton Center, a large-animal hospital and campus about 35 miles west of the campus proper.