ABM Offers $3.7M in Energy Savings to Georgia School District

Facility solutions provider ABM recently announced that it will be partnering with the Dooly County School System in Vienna, Ga., to form an Energy Performance Contracting program. The program will save the school district about $3.7 million in energy and operating cost savings over the next 20 years, according to a press release. The savings will come primarily from energy-saving infrastructure solutions and custodial and maintenance services.

“Our students deserve state-of-the-art facilities,” said Dooly County School System Superintendent Dr. Craig Lockhart. “This project, through an innovative solution, helps our community achieve more for each school, to perpetuate success for every student.”

The energy savings and reduction in operating costs will come through improved lighting, HVAC equipment, and controls at the district’s K–8 Academy and high school. It will also offer larger space for bus maintenance and upgrades to student athletic facilities such as additional bathrooms, new lighting, and improved playing surfaces. The project will also entail installing a new roof for the high-school gymnasium and a reconfigured HVAC system to extend the roof’s life and offer interior climate control.

“We not only improve infrastructure through projects like this for our clients, but we also protect and preserve those investments for students, teachers, and staff with ongoing maintenance and custodial services,” said ABM President of Education Valerie Burd.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Minnesota District Opens New PreK–12 School

    Gibbon-Fairfax-Winthrop Schools in Gibbon, Minn., recently announced that construction is complete on a new, $68.9-million school for students in grades PreK–12, according to a news release.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.