All Articles


sports facility

Facilities (Sports and Fitness)

Let's Play Ball! Managing Sport Facilities

confinged spaces

Case Histories (Real-World Solutions)

Turning Confined Spaces Into Agile Classrooms

Harvard University

Facility Focus (Student Centers)

Harvard University: Richard A. and Susan F. Smith Campus Center

trade school

Facilities (Workforce Development)

A Changing Workforce Demands Change in Education

Tulane University

Facility Focus (Student Centers)

Tulane University: Mussafer Hall

Ask the Expert (Restroom Fixtures)

Why should we install waterless urinals?

Emerging Technology (Enhancing, Engaging, Connecting)

Changing the Landscape

Innovative AV technologies are changing the higher ed experience.

building envelope

Facilities (Campus Spaces)

From the Outside In

Building envelope systems not only work to keep the inside in and the outside out, but can also contribute to a facility’s or institution’s sustainability goals while presenting an attractive, functional front.

makerspace

Reinventing the Student Experience

Makerspaces are providing students with the tools they will need in the world of work through hands-on projects and the use of cutting-edge technology.

building exteriors

Facilities (Building Envelope)

3 Critical Elements of a Building Exterior

The 66,000 square-foot campus will feature 26 classrooms, a space for students enrolled in the district’s Therapeutic Learning Program, administrative offices, a multipurpose cafeteria/auditorium and play-fields.

New School Construction

Santa Maria-Bonita Elementary Celebrates Construction Milestone

The two-story, $51 million school was designed by DLR Group and constructed by AMG & Associates. When completed in August 2020, it’s expected to accommodate up to 900 students in transitional kindergarten through sixth grade.

Infrastructure Solutions

King William County Public Schools Projected to Save Millions in Operating Costs

Through ABM’s Energy Performance Contracting program, the customized solution is projected to save the school district close to $5 million in energy and operating costs over a 15-year period.

The upper half of a school bus is shown with the words "School Bus" printed between the headlights.

School Transportation

Alabama SD Reduces School Bus Idle Times with New Software

Montgomery Public Schools in Alabama recently installed Verizon Connect, a GPS fleet tracking software, that has significantly reduced school bus idling times by almost 80 percent.

Sponsored Content

  • Wenger Corporation

    In modern educational environments, the efficient organization of resources plays a pivotal role in enhancing the learning experience. Read More