Nathan Bishop Middle School Makes Transformation with Help From Acentech

Nathan Bishop Middle School Makes Transformation with Help From Acentech 

Acentech worked with Ai3 to upgrade the acoustical standards of Nathan Bishop Middle School in Providence, R.I.

After a three year, $35 million renovation, Nathan Bishop Middle School transformed from a decaying, struggling institution into one of the most sought after public middle schools in Providence, R.I.

During the renovation, Acentech worked closely with Ai3 Architects to upgrade the original 1920s building to the acoustical standards of the 21st century. Following the acoustical goals established by the Collaborative for High Performance Schools in New England and the ANSI S12.60-2002 American National Standard of Acoustical Performance Criteria, Design Requirements and Guidelines for Schools, Acentech focused its recommendations on room acoustical treatments, sound isolation and mechanical systems noise control. We ensured that acoustical treatments, in the classrooms as well as other activity spaces (e.g. gymnasium, cafeteria and auditorium), were suitably selected and distributed in order to control the reverberation time, achieve high speech intelligibility and overall acoustical comfort.

Acentech specified wall and floor/ceiling constructions as well as door and window systems to provide an adequate degree of sound isolation between adjacent spaces. Finally, Acentech worked with the mechanical engineering team to ensure that the noise from the mechanical systems were quiet and did not have a negative effect on the learning environments.

Acentech
www.acentech.com

This article originally appeared in the School Planning & Management August 2013 issue of Spaces4Learning.

Featured

  • R.I. District Holds Ribbon-Cutting Ceremony for New Elementary School

    Cranston Public Schools in Cranston, R.I., recently announced the completion of Gladstone Elementary School, according to a news release. The 100,000-square-foot facility serves as a replacement for the 1950s-era former building, and it consolidates the student, faculty, and staff populations of Gladstone and Arlington Elementary Schools.

  • Missouri K–12 District Cuts Ribbons on Two New Middle Schools

    Springfield Public Schools in Springfield, Mo., recently celebrated the completion of two new middle school facilities with ribbon-cutting ceremonies, according to a district news release. The district officially opened the new Pipkin Middle School and Reed Academy on Sept. 3, both of which were funded through the $220-million Proposition S bond program approved by voters in 2023.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.