Winning Locker Room Design

Winning Locker Room Design

Wenger provided the University of Minnesota with easy-to-clean lockers that also give players a place to relax and unwind after a game or practice.

“Our previous lockers looked outdated and it was also time to update their functionality,” says Andy Harris, assistant director of Football Equipment at the University of Minnesota in Minneapolis.

“We wanted a locker room that gives the ‘wow factor’ every time players walk in,” explains Harris.

“Wenger did an outstanding job translating our goals into reality,” recalls Harris. These unique lockers include several new features developed specifically for this project. Ventilation ducts integrated into each locker’s foot locker and topper unit are tied into the main HVAC system to accelerate equipment drying.

Sanitation is a “huge issue” for locker rooms, according to Harris. Drying out everything in a timely manner is important.

Cleaning the lockers is easy — all wooden surfaces feature an antimicrobial, polyester laminate finish that makes wiping them down simple and quick. This finish material prevents bacteria and viruses from penetrating into the wood, helping reduce the spread of MRSA, colds or flu.

Aesthetically, the university’s maroon and gold colors are incorporated throughout the locker design. A padded seat, which doubles as the footlocker lid to help conserve valuable floor space, is also a GearBoss first.

To display player information or photos, each locker includes a built-in digital picture frame, enabling a player to customize his own locker’s appearance. Accent lighting provides visual highlights for certain locker elements, including an etched-glass door enclosing the topper unit that holds helmet and shoulder pads.

Harris says the locker room has become a comfortable place for players to relax. He concludes, “With the locker room’s open design and more locker space, everyone just feels more like part of the team.”

www.wengercorp.com

This article originally appeared in the College Planning & Management November 2013 issue of Spaces4Learning.

Featured

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • modern college building with circuit and brain motifs

    Anthropic Introduces Claude for Education

    Anthropic has launched a version of its Claude AI assistant tailored for higher education institutions. Claude for Education "gives academic institutions secure, reliable AI access for their entire community," the company said, to enable colleges and universities to develop and implement AI-enabled approaches across teaching, learning, and administration.

Digital Edition