Energy Saving Retrofit

Energy Saving Retrofit 

Before and after the retrofit.

Energy savings have long been important at Regis High School, a tuition-free Jesuit college preparatory school for young men in New York. This drove school leadership to choose Seesmart Technologies, Inc. when it came time to retrofit more than 2,500 fluorescent lights throughout the school.

Regis’ estimated LED retrofit benefits include significant energy savings of more than $36,000 and over 116,000 kilowatt-hours per year with a carbon footprint reduction of almost 120,000 pounds per year. Additionally, the preparatory school received a $32,000 rebate from Con Edison.

“Here at Regis, we pride ourselves in fostering a spirit of generosity and service, so decreasing our carbon footprint was an obvious decision for the betterment of our neighborhood,” says Father Judge, president of Regis High School. “This project was a big step toward setting a good example for our students and the community as it solidifies our commitment to a more sustainable future.

Seesmart’s retrofit for Regis High School began by replacing the light fixtures in the gymnasium with LED fixtures. After seeing the results in the gym the administration decided to replace all of the school’s lighting with LED fixtures. Fluorescent lights were replaced with Seesmart LED tube lighting in over 100 classrooms, offices, and other educational spaces, as well as extensive hallways. The changeover included 967 new or retrofitted fixtures.

Father Judge says, “Since 2006, Regis has been an educational leader in ‘going green’ which can be seen by our 22 kilowatt solar panel array on the roof, a 22,000 square-foot green roof installation, as well as other sustainable efforts. Committing to an entirely LED facility with the help of Seesmart was the next step in our efforts to further decrease our carbon footprint.”

www.seesmartled.com

This article originally appeared in the issue of .

Featured

  • Photo courtesy of Kraus-Anderson

    Minnesota District Completes $49.7M Addition, Renovation Project

    St. Paul Public Schools in St. Paul, Minn., recently announced the completion of a $49.7-million addition and remodeling project at two district schools, according to a news release.

  • Architectural Power for the Modern Campus Landscape

    For generations, an outdoor classroom only required a textbook and a patch of grass. Today, not only has the laptop replaced the printed pages, the rise of agile learning has turned campuses into study halls with students listening to lectures and researching topics from quads, gardens, and plazas. The challenge for architects and facility managers is to provide connectivity without cluttering the landscape with visual eyesores or creating safety hazards with extension cords.

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.